The pool and spa repairs are almost complete. The spa heater has been installed. The handrail for the spa will be installed next week. The pool ladders and handrails have been installed. The water is still being treated in both the spa and pool.
The fountain lights should be installed next week.
2 pagoda lights were added across from lots 199 and 200 along the roadway. It was an area that needed more light.
2 water leaks were repaired this week. One leak was into the lake, and the other was a main supply line on a lot. Thank You John and Jay for getting them repaired so quickly.
|