The upstairs kitchen fridge is working! Please do not adjust the thermostat. The refrigerator was deep cleaned while it was awaiting repairs.
A roofer came out to inspect the leak in the exhaust hood. I am waiting on a quote for repair.
The issue with the fire alarm monitor panel has been resolved. There was a lapse in the communication system, and a back-up battery was needed as well.
There is still no update on the fountain lights. PLM was here Thursday to check the lake. Everything looks great.
Two pagoda lights with wiring issues have been repaired. There are four more that need to be dug up and rewired.
The pool and spa will be closed starting December 2nd. The pool area will be closed while the work is being done. Plaster work is expected to last just over a week and then an additional 2 weeks for filling and chemical balance. I will post another update in 2 weeks.
Have a great weekend. Rene and I hope you all have a safe and Happy Thanksgiving!
|