Where are the weeks going. I can’t believe it’s March 1st. Hopefully we start getting some warmer weather. The winter has been chilly.
The pool heaters have been turned on to make sure there are no issues. One of the heaters will need a new control panel. It will take about 2 weeks to get and is under warranty. The water has warmed up from 58 to 70 since Monday.
Over the next few weeks we will be checking water valves in the roads. You will experience a brief disruption while we check valves. An email will be sent the morning of testing so please check your emails.
Bluffton Plumbing will be performing the repair of the main backflow. Parts are on order. There is no repair date scheduled yet.
The fountains will be pulled ashore next week and cleaned.
The scrap area has been cleaned up. There are still a few items that need to be cut up and put in the dumpster. Please do not leave items near the dumpsters, recycle area or the maintenance area. All items must be put in the trailer storage area. If you need assistance getting items removed, please email me.
Have a great week and safe travels.
|